MASPRO Media Releases

Built to last longer: MASPRO celebrates 20 years

Two MASPRO technicians conferring over large red hydraulic drill stem and hose assembly in workshop.

FEAURED IN AUSTRALIAN RESOURCES & INVESTMENT

Founder Greg Kennard’s vision for MASPRO came from his early years in the tool room of his father’s engineering business.

The company opened in Condobolin, New South Wales in 2006 with a single CNC lathe. Twenty years on, MASPRO employs over 100 people across four Australian facilities and has opened its first business entity overseas.

The pitch to mining operators has held steady over that time: “like new” is not sufficient. A replacement part should outlast the one that failed.

Engineering for real site conditions

MASPRO’s approach starts with the conditions a component actually faces on site. Rather than reproduce a part to its original drawing, the team studies how it wears and fails under a particular operation’s loads and duty cycles, then questions the design assumptions.

The results show up in the field. On a surface drilling fleet, MASPRO’s re-engineered rotary heads lasted over three times as long as the parts they replaced, an improvement worth more than $1.5 million a year to the operation. At one WA mine, its breakout jaws lasted four times as long. Fewer premature failures also mean fewer reactive repairs and less maintenance work carried out under time pressure.

 

A growing footprint at home and offshore

MASPRO was recognised as an OEM-aligned supplier in 2007. As its customer base spread across the country, the company found that component quality was not enough if the part was days away from site, so stock availability and local support became part of the value proposition.

That thinking shaped the network MASPRO now calls its Reliability Hubs. A distribution centre opened in Perth in 2016, followed by Mt Isa in 2018. In 2021 MASPRO added 2,314 m² of manufacturing space at Condobolin and opened a combined distribution and manufacturing site in Sydney. In 2024 it expanded its Perth presence with a Customer Hub, giving Western Australian operations more direct support.

The next move is offshore. MASPRO has now established an Indonesian entity, giving the company a formal footing to strengthen relationships with mining operations in the region.

Building manufacturing capability

From that first lathe in 2006, MASPRO has built an in-house workshop of CNC lathes and mills and added robotic cells for loading and welding. Automation keeps production and turnaround consistent. By 2025 its processes had earned ISO 9001 certification for quality management and AS/NZS ISO 3834.2 certification for welding quality.

Looking back on two decades, Greg Kennard puts the company’s growth down to its record on site. “The first 20 years were about earning trust by solving difficult reliability problems in the field,” he said.

Now MASPRO is ready for what’s next: redefining reliability through continued investment in Australian manufacturing, automation and its people, and support for more operations at home and overseas.

Redefining Reliability

Ready to improve reliability?

Let’s find the right solution for your operation

Whether you’re looking to improve component performance, strengthen supply certainty or reduce maintenance downtime, our team will work with you to understand the challenge and identify the right solution for your operation.

Talk to our team

Knowledge hub

MINING RELIABILITY INSIGHTS FROM THE FIELD

Explore insights

Engineered for performance

Explore our products

Improve reliability

Explore our solutions

Start a conversation

Talk to our team

© MASPRO 2026. All rights reserved.