MASPRO has recorded a 100.6 per cent increase in percussion hours following the installation of its upgraded feed cradle assembly on an underground development jumbo at a Western Australian hard-rock mining operation.
Historical cradle records showed cracking and inconsistent service life under demanding scaling and bolting conditions. Premature replacements were adding to maintenance requirements and costs, interrupting equipment availability and reducing operational efficiency.
MASPRO responded with an upgraded cradle assembly designed specifically for underground bolting, using upgraded materials selected for demanding mining conditions and a design aimed at improving fatigue resistance under repetitive bolting loads.
The assembly also featured a pre-assembled pipe to simplify installation and reduce fitter preparation time.
The upgraded MASPRO cradle assembly was installed on the same jumbo and boom used in previous operations, allowing its performance to be compared against historical cradle records.
Field results record longer service life
Performance showed substantial improvements across three measures:
- Percussion hours increased by 100.6 per cent, from a historical average of 985 hours to 1,976 hours with the MASPRO assembly
- Power Pack hours increased by 120.9 per cent, from a historical average of 2,573 hours to 5,683 hours
- Installed duration increased by 61.8 per cent, from a historical average of 365 days to 591 days.
The comparison draws on four historical cradle installations and one MASPRO installation. Although the results reflect a specific application, the recorded improvements provide evidence of the potential value of engineering changes informed by actual operating conditions.
For underground operators, longer service life means fewer cradle change outs, which can ease pressure on maintenance resources and support more consistent equipment availability.
Combined with simplified installation, these improvements have the potential to reduce the operational effort required throughout the component’s lifecycle.
Reliability informed by real operating conditions
For MASPRO, the focus is on understanding the demands placed on equipment and applying design improvements that support longer service life and more effective maintenance execution.
The results reinforce MASPRO’s approach to redefining reliability, where component performance, maintenance requirements and equipment availability are considered together.
For mining decision makers, the case shows the value of recorded field performance in supporting equipment reliability and operational continuity.