MASPRO FEED CRADLE ASSEMBLY DELIVERS 100% MORE PERCUSSION HOURS

Cradle Assembly Case Study

Customer Context

Operating Environment

Operating in the demanding conditions of underground hard rock mining, the development jumbo was exposed to significant stresses during scaling and bolting operations. Repetitive loading placed considerable demands on the cradle assembly, making durability and service life critical to maintaining equipment reliability and minimising unplanned maintenance.

Core Issue

 

• Historical cradle records showed cracking and inconsistent service life.
• Premature cradle replacements increased maintenance requirements and interrupted equipment availability.
• Frequent change-outs contributed to higher maintenance costs and reduced operational efficiency.
OEM Cradle: Used OEM cradle assembly showing wear and damage following underground operation.

OEM Cradle: Used OEM cradle assembly showing wear and damage following underground operation.

Solution

MASPRO Intervention

• Supplied an upgraded MASPRO Cradle Assembly designed specifically for underground bolting applications.
• Selected upgraded materials to withstand demanding mining conditions.
• Redesigned the assembly with improved fatigue performance under repetitive bolting loads as a design objective.
• Supplied the pipe pre-assembled to simplify installation and reduce fitter time.
IMPLEMENTATION SNAPSHOT
• Installed the MASPRO Cradle Assembly on the same jumbo and boom used in previous operations.
• Compared performance against historical OEM cradle records to assess improvements in service life and reliability.
MASPRO Cradle Assembly featuring upgraded materials and a bolting-focused design. MASPRO Part Number: 010201008

MASPRO Cradle Assembly featuring upgraded materials and a bolting-focused design. MASPRO Part Number: 010201008

Results

 

Increased Reliability and Measurable Performance Gains

• 100.6% more percussion hours — 1,976 vs. 985 historical OEM average.
• 120.9% more Power Pack hours — 5,683 vs. 2,573 historical OEM average.
• 61.8% longer installed period — 591 days vs. 365 historical OEM average.
The MASPRO Advantage
• UPGRADED MATERIALS AND BOLTING-FOCUSED ENGINEERING DESIGNED TO IMPROVE FATIGUE RESISTANCE.
• PRE-ASSEMBLED PIPE SIMPLIFIES INSTALLATION AND REDUCES FITTER PREPARATION.
• LONGER RECORDED SERVICE LIFE SUPPORTS IMPROVED EQUIPMENT AVAILABILITY AND LOWER REPLACEMENT COSTS PER OPERATING HOUR.

Results are based on one MASPRO cradle installation compared with four historical OEM cradle installations on the same jumbo and boom. Performance may vary depending on operating conditions, application and maintenance practices. Results are not a guarantee of future performance.

Redefining Reliability
Share this case study

Ready to improve reliability?

Let’s find the right solution for your operation

Whether you’re looking to improve component performance, strengthen supply certainty or reduce maintenance downtime, our team will work with you to understand the challenge and identify the right solution for your operation.

Talk to our team

Knowledge hub

MINING RELIABILITY INSIGHTS FROM THE FIELD

Explore insights

Engineered for performance

Explore our products

Improve reliability

Explore our solutions

Start a conversation

Talk to our team

© MASPRO 2026. All rights reserved.