Uncategorised
08 Jul 2026
48% REDUCTION IN ROPE CONSUMPTION ACROSS JUMBO FLEET
Read post
Case Studies
08 Jul 2026
66% REDUCTION IN CYLINDER CONSUMPTION THROUGH TFX FEED SYSTEM REDESIGN
Read post
Case Studies
08 Jul 2026
154% LIFESPAN INCREASE ON ROTATION HEAD THROUGH LOAD-PATH REDESIGN
Read post
Whitepaper
07 Jul 2026
RELIABILITY DRIFT
Read post
Whitepaper
07 Feb 2026
ENGINEERING OUT FAILURE IN HARSH MINING ENVIRONMENTS
Read post
Whitepaper
10 Jun 2026
BEYOND ORIGINAL SPECIFICATION
Read post
Articles
28 May 2026
The reliability issue miners overlooked
Read post
Articles
20 Mar 2026
MASPRO redefines reliability at Mineral Hill
Read post
Articles
13 Feb 2026
A different way to think about reliability
Read post
Articles
24 Mar 2026
Redefining reliability: When systems wait, operations pay the price
Read post
Articles
09 Apr 2026
When energy waits, reliability slows
Read post
Articles
21 May 2026
Underground reliability problems rarely start with catastrophic failure
Read post
Articles
08 Apr 2025
How MASPRO’s uncompromising quality keeps mine sites running
A MASPRO engineer conducting detailed inspection of a mining component using a coordinate measuring machine (CMM). Advanced quality control ensures accuracy, durability, and consistent performance in harsh mining environments.
Read post
Articles
09 Jan 2025
Into the future with MASPRO
MASPRO’s Hercules machining centre paired with a two-tonne overhead crane inside its Australian manufacturing facility. The integrated setup improves safety, reduces handling time, and enables consistent scheduling for high-precision mining components, supporting faster turnaround and scalable production.
Read post