KNOWLEDGE
HUB

Uncategorised
08 Jul 2026

48% REDUCTION IN ROPE CONSUMPTION ACROSS JUMBO FLEET

Read post
Case Studies
08 Jul 2026

66% REDUCTION IN CYLINDER CONSUMPTION THROUGH TFX FEED SYSTEM REDESIGN 

Read post
Case Studies
08 Jul 2026

154% LIFESPAN INCREASE ON ROTATION HEAD THROUGH LOAD-PATH REDESIGN 

Read post
Whitepaper
07 Jul 2026

RELIABILITY DRIFT

Read post
Whitepaper
07 Feb 2026

ENGINEERING OUT FAILURE IN HARSH MINING ENVIRONMENTS

Read post
Whitepaper
10 Jun 2026

BEYOND ORIGINAL SPECIFICATION

Read post
Articles
28 May 2026

The reliability issue miners overlooked

Read post
Articles
20 Mar 2026

MASPRO redefines reliability at Mineral Hill

Read post
Articles
13 Feb 2026

A different way to think about reliability

Read post
Articles
24 Mar 2026

Redefining reliability: When systems wait, operations pay the price

Read post
Articles
09 Apr 2026

When energy waits, reliability slows

Read post
Articles
21 May 2026

Underground reliability problems rarely start with catastrophic failure

Read post
Articles
08 Apr 2025

How MASPRO’s uncompromising quality keeps mine sites running

A MASPRO engineer conducting detailed inspection of a mining component using a coordinate measuring machine (CMM). Advanced quality control ensures accuracy, durability, and consistent performance in harsh mining environments.

Read post
Articles
09 Jan 2025

Into the future with MASPRO

MASPRO’s Hercules machining centre paired with a two-tonne overhead crane inside its Australian manufacturing facility. The integrated setup improves safety, reduces handling time, and enables consistent scheduling for high-precision mining components, supporting faster turnaround and scalable production.

Read post